Product Introduction:
Product Overview: Shantui SE210W excavator is a high-performance wheeled excavator that combines efficient operation and flexible movement. It is suitable for various scenarios such as municipal engineering, highway construction, and has become a reliable equipment in engineering construction with its stable performance.
Product Specification Parameters: The overall operating weight is approximately 21 tons, with a standard bucket capacity of 1.0 - 1.2 cubic meters. The engine's rated power is 110kW, the maximum digging radius reaches 8.5 meters, and the maximum digging depth is 5.8 meters, meeting the needs of medium and large-scale engineering operations.
Product Performance: Adopting advanced matching technology of power and hydraulic systems, it features high operating efficiency and low fuel consumption. It moves flexibly and steers accurately in complex terrains, quickly adapting to different construction environments and ensuring long-term stable operation.
Specifications:
Comparison items | SE210W |
Overall length (mm) | 9543 |
Ground length (when transporting) (mm) | 4860 |
Overall height (to the top of the boom) (mm) | 3039 |
Overall width (mm) | 2800 |
Overall height (to the top of the cab) (mm) | 2977 |
Counterweight ground clearance (mm) | 1120 |
Minimum ground clearance (mm) | 470 |
Tail swing radius (mm) | 2905 |
Track length (mm) | 4160 |
Track gauge (mm) | 2200 |
Track width (mm) | 2800 |
Standard track shoe width (mm) | 600 |
Width of rotary platform (mm) | 2726 |
Distance from rotary center to rear end (mm) | 2853 |
Product Advantages:
①Reinforced Working Device:
Shantui SE210W excavator has fully optimized its structural design, focusing on strengthening the strength of key stress positions to improve the equipment's resistance to damage under harsh working conditions and extend its service life.
The bucket bottom plate, side plates and reinforcing plates are made of high-strength wear-resistant materials, significantly enhancing the bucket's wear resistance, reducing losses caused by material friction and lowering replacement frequency.
It supports flexible combination of multiple specifications of booms, arms and buckets, which can be quickly adjusted according to different working conditions such as earth excavation and material loading, improving operational adaptability.
②High-end System Configuration:
Equipped with a turbocharged engine, it has excellent plateau adaptability and can maintain stable power output in high-altitude areas, ensuring that operating efficiency is not affected by the environment.
The hydraulic system has undergone comprehensive construction verification, multi-working-condition debugging and full-load testing, with high working pressure and low pressure loss, achieving precise balance between power and energy consumption and improving operation response speed.
③Spacious and Comfortable Operating Environment:
The interior of Shantui SE210W excavator's cab adopts full injection molding technology, and the interior color is coordinated based on ergonomic principles, effectively reducing visual fatigue of operators and improving comfort during long-term operations.
The driving space is spacious with a wide field of vision, and the control devices are reasonably arranged for convenient operation, reducing operational errors and improving work efficiency.
Equipped with a high-power air conditioning system and a suspended seat, the temperature and seat angle can be adjusted according to needs, creating a comfortable working environment for operators and reducing fatigue.
Product Application Scenarios:
①Municipal Engineering:
In urban road repair, Shantui SE210W excavator, relying on its flexible steering performance, can easily move around in narrow streets, accurately complete the excavation and cleaning work of damaged road surfaces. Whether it's digging out old asphalt layers or removing construction waste, it can complete the tasks efficiently without causing significant interference to surrounding municipal facilities and traffic.
For underground pipeline laying projects, it can conduct precise trench excavation. According to the requirements of pipelines with different diameters, it can flexibly adjust the depth and width of the excavation. Meanwhile, by taking advantage of the flexible combination of multi-specification buckets, it can quickly transport the excavated earthwork to ensure the construction progress.
In the construction of urban parks and the renovation of squares, Shantui SE210W excavator can be used for site leveling, digging holes for planting green plants and excavating the foundations of landscape ornaments. Its flexible operation performance can well adapt to the limited space environment and create beautiful and comfortable public spaces.
②Highway Construction:
During the excavation stage of highway subgrade, the powerful digging force of Shantui SE210W excavator can quickly break through the soil layer and dig out the standard subgrade shape according to the design requirements, laying a good foundation for subsequent filling and compaction processes.
In the slope trimming process, it can precisely trim the slope surface with its accurate operation to ensure that the slope gradient meets the safety standards, avoiding potential safety hazards such as landslides and ensuring the long-term stability of the highway.
In the daily maintenance and small-scale expansion projects of highways, such as adding emergency parking strips and widening local sections, Shantui SE210W excavator can quickly respond to the construction needs and efficiently complete tasks such as excavation and earthwork transportation without affecting the normal traffic flow.
③Port Logistics:
In port cargo loading and unloading scenarios, Shantui SE210W excavator can cooperate with transport vehicles to complete the loading of bulk cargo. For different types of bulk cargo, such as coal, ore, sand and gravel, by taking advantage of the flexible switching ability of multi-specification buckets, it can choose the appropriate bucket for efficient loading to ensure that the cargo can be quickly and accurately loaded into the vehicle.
For the tidying work of port stockyards, it can gather and level the disorderly stacked goods, facilitating the subsequent storage and management of goods and improving the space utilization rate and cargo turnover efficiency of the port stockyard.
In some small-scale construction projects in ports, such as the foundation excavation of wharf ancillary facilities and the construction of drainage facilities, Shantui SE210W excavator can also complete the corresponding excavation tasks well by virtue of its flexible movement and stable operation characteristics.
④Mine Auxiliary Operations:
In the stripping work of small mines, the wear-resistant bucket and stable power system of Shantui SE210W excavator can adapt to the harsh environment with many gravels, efficiently stripping the surface waste rocks and soil, creating favorable conditions for subsequent ore mining.
In the ore transfer process, it can load the mined ore onto transport vehicles. According to the size and weight of the ore, it can flexibly adjust the operation mode of the bucket to ensure that the ore can be safely and quickly transferred, ensuring the production continuity of the mine.
In the construction and maintenance of mine roads, Shantui SE210W excavator can carry out earthwork excavation, widening and slope trimming of the roads, helping to improve the internal traffic network of the mine and facilitating the passage of various mining equipment.
⑤Water Conservancy Projects:
In river dredging projects, Shantui SE210W excavator can operate along the river bank or in shallow water areas. By taking advantage of its flexible steering and appropriate control of the digging depth, it can dig out the silt and debris at the bottom of the river and transport them to the designated locations, restoring the normal water flow capacity of the river and preventing flood disasters.
For the construction and reinforcement projects of small reservoirs, ponds and other water conservancy facilities, it can carry out the excavation of dam foundations, the transportation of earthwork and the trimming of slope protection, ensuring the structural stability of the water conservancy facilities and improving their water storage and flood control functions.
In the excavation and maintenance of irrigation channels, Shantui SE210W excavator can accurately dig out the shape of the channels according to the design requirements to ensure smooth water flow and meet the needs of farmland irrigation.
⑥Building Construction:
In the foundation excavation stage of construction sites, Shantui SE210W excavator can quickly and accurately complete the earthwork excavation work according to the foundation size and depth requirements of the building design, preparing for subsequent foundation pouring and other processes.
For the material transfer within the construction site, it can transport building materials such as sand, stones and bricks between different construction areas, improving the construction efficiency and reducing the workload of manual handling.
In the debris cleaning work after the demolition of buildings, Shantui SE210W excavator, by taking advantage of its powerful digging force and flexible operation performance, can concentrate on cleaning and loading the construction waste, facilitating unified transportation and treatment, accelerating the cleaning progress of the site and facilitating the subsequent new project development.
Frequently Asked Questions:
Question: What is the maximum travel speed of Shantui SE210W excavator?
Answer: The maximum travel speed can reach 35km/h, facilitating quick transfer between different construction sites and saving time costs.
Question: How is the maintenance cycle of the equipment set?
Answer: The regular maintenance cycle is once every 200 hours, mainly including oil change and filter cleaning, which can be adjusted appropriately according to the operation intensity.
Question: Does it support remote fault diagnosis?
Answer: Yes, through the intelligent monitoring system, remote data collection and fault early warning can be realized, and the after-sales team can quickly respond and provide solutions.
Question: How is the wear resistance of the tires?
Answer: It is equipped with engineering-specific wear-resistant tires, designed for complex roads, with strong puncture resistance and long service life.